How large chandeliers are packed, shipped and installed

2026-10-02 · 6 min read

A three-metre fixture is not a big parcel. It is a structure that has to survive a container, a crane and an electrician. What to agree before production starts.


Large decorative lighting fails far more often in logistics than in manufacture. The fixture can be perfect in the workshop and arrive unusable, or arrive perfectly and be impossible to hang. Almost all of that is decided before production, in four conversations.

Conversation 1: how it is split

Any fixture that will not fit through the narrowest point of the route must be built in sections. The split is a design decision, and the right place to split is where a joint will not be visible from the normal viewing position. On a multi-tier piece, that usually means splitting between tiers rather than across a tier.

Ask for the module count and the size of the largest module before approving the drawing. If the largest module will not pass a doorway or fit a lift, the design needs to change while it is still a drawing.

Conversation 2: how it is packed

What good export packing looks like on decorative lighting:

Ask for photographs of the packed crates before the container is sealed. This is a five-minute request that prevents an unwinnable argument three weeks later.

Conversation 3: who is responsible at the destination

Decide and document: who clears customs, who pays duty, who arranges inland transport from the port to site, and who unloads. On project orders, unloading a two-tonne crate is a real problem if nobody has arranged a forklift. Write it into the order confirmation rather than assuming it is obvious.

Conversation 4: how it is installed

What a customer should receive with a large fixture:

With those documents, a competent local contractor or general electrician can install the piece without specialist help. Remote guidance by video call covers the last 10% of uncertainty.

Damage in transit: what to do on delivery

  1. Photograph the crates before opening anything, especially any visible external damage.
  2. Open with the delivery driver present if damage is visible.
  3. Photograph damaged components in place before removing them.
  4. Note the damage on the delivery document before signing, or sign as “unchecked” where the carrier permits it.
  5. Send the photographs to the supplier the same day.

A supplier who will not replace transit damage under these conditions is telling you something about how the next order will go. Confirm the policy before ordering: replaceable parts, at whose cost, within what period.

One last thing worth asking

Ask what spare parts are included. Glass and crystal pieces break, and a single missing element can hold up a handover by weeks while a replacement is made and shipped. Spares ordered with the original run cost a fraction of spares ordered afterwards.

See it built

Films from our own workshop and from installed projects — the same process your order goes through.

Related reading

More on this subject

Have a project you need quoted?

Send dimensions, a drawing or a reference photo. You get a straight answer — including “this will not work” if that is the truth — within one working day.

Request a Quote
Questions

Questions about shipping and installing a large chandelier

How is a large chandelier packed for shipping?
Crate-packed to export standard, and split into modules where the transport route requires it. A multi-tier piece will often ship as separate tiers that assemble on site, with every component numbered to match the crate labels so the crew can find what they need. The packing list, commercial invoice and certificate of origin go out with the shipment, and spare parts are included so a single break does not stop handover.
Will it fit through the door and up the stairs on site?
That question has to be answered before the fixture is built, not after it is delivered. We need the delivery route: the door widths, the stairwell, the lift dimensions and any turning points. Where a piece will not fit as one unit, it is designed to split, with the joint positions decided in the drawing rather than discovered in a corridor. If you do not know the route measurements, tell us what the access looks like and we will tell you what is realistic.
Who installs it?
Your own contractor, following the drawings we supply, with remote guidance from us. Every large fixture ships with a rigging and wiring drawing, a component and joint numbering sheet, and the load per fixing point so your structural engineer can approve it. Larger pieces include a 1:1 installation drawing. We do not send our own installers and we do not take responsibility for a local crew’s work — but if the drawing is clear, any competent local installer can do it.
What is the lead time from approval to delivery?
Production is 60–80 days after your written approval of the prototype, and shipping sits on top of that. We give you the real date at quotation stage. If the project has a fixed handover date, tell us at enquiry stage — we would rather decline a date we cannot hit than promise one we cannot keep, and we will tell you early if the programme is tight.
What happens if something arrives damaged?
Note the damage at delivery and photograph it — that has to be recorded on the delivery receipt, and it is the single most important step. If a small part is damaged, we supply the replacement accessory free of charge. For damage to the fixture itself, we will either replace it or agree a credit, depending on what the inspection shows. Transit insurance is your decision, but on crated freight it is worth having.